Short Description


MS-Circuits
Installation of all usual products with any number of control panels and measuring fields. Installation of the fields through prescribed openings in the concrete floor or on profile frames for elevated plate floors.
NS-Switch gears
Installation of the closed building analogue to MS systems. In an open construction, a wall-ready mounting, independent of brand, with armature rails is possible. Temporary power is usually on the entrance side above the door.
Transformer
Installation (after assembling the distribution grid station on location) through doorway on the concrete floor or, if preferable, also on the profile rails. Spacing of the rails is according to normal track measurements of each transformer model. Transformers up to 1250 kVA may be used without constructive changes to the building.
Earthing
Reinforcement and all metal parts are welded together and configured as a common earth connection. For the connection of the outer earth, an insulated earthing bolt (eg. HD-E) is cemented into the false floor (NFT-stations) or in the wall (NFN- or NFH-stations). If desired, potential ring earthing can be delivered around the building.
Lighting
Lamps and sockets will be installed according to agreement. (Also available in ex-models)
Example: Typ NFT 1/600

Example: Typ NFT 1/480

Ready-made mounting of the switchgears can be done in the factory.